Project Overview
Solar Hybrid Stations (SHS)
O&M
Sabah
2021
Project Details
Total
24 SHS
Completion Date
May 20, 2021
Project Owner
Sabah Electricity Sdn. Bhd. (SESB)
TNBES Role
Operation & Maintenance
Project Performance
As of May 2021
Planned:
10%
Actual:
90%
90%
Completed
Scope of Work
Operation - Ensure the system is in good condition and to provide uninterrupted electricity supply to consumers.
Maintenance - Carry out the routine on-site inspection and preventive & predictive maintenance including visual inspection, functionality, profiling data (event) for Inverter System, Battery System, Solar PV System, Diesel Generator System.
Troubleshooting - Response time within 24 hours. Deploying technical team to inspect and troubleshoot faults upon receiving any breakdown report.
Spareparts - TNBES shall keep an inventory of critical and most frequently used spare parts. Other spares shall be purchased as and when required.